The hydraulic rock drill and splitter is a heavy-duty engineering machine that integrates drilling and cracking functions. It is widely used in mining, tunnel construction, road construction, and other scenarios. In Indonesia, with the growth of metal mineral demand and the acceleration of infrastructure projects (such as the construction of the new capital and the Sumatra Railway), the drilling and cracking machine has become the mainstream choice for hard rock crushing with its advantages of “no vibration, low dust, and precise operation”.
The YG drilling and cracking machine is designed for the high temperature and high humidity environment in Southeast Asia. It can quickly penetrate hard formations such as granite and basalt. The efficiency is more than 5 times higher than that of manual rock drilling, which greatly reduces the overall construction cost.
Hydraulic rock drill and splitter parameters
Rock Drilling Machine | |||
Power | Drilling hole diameter | Drilling depth | Drilling speed |
24kw | Middle 120mm | 1600mm | 1m/min |
Splitting Machine | |||
Splitting depth | Splitting force | Rotation angle | – |
1000MM | 8000T | 120° | – |
Push Beam | |||
Rock drilling maximum propulsion | Splitting maximum pullout force | ||
25KN | 70KN | ||
Excavator requirements:>25T |
Core advantages of YG drilling and splitting machine
- More durable: key hydraulic parts are made of German brands and can operate continuously for 8,000 hours without major repairs;
- More flexible: the body width is only 1.2 meters, and it can turn freely in narrow mine tunnels;
- More cost-effective: the life of consumables is extended by 30%, and the cost of accessories is reduced by 20%
Customer Cases Background of purchasing a drilling and cracking machine
In 2023, a local Indonesian mining company undertook a large-scale nickel mining order. The rock hardness in the mining area reached 250MPa. The traditional blasting method could not be used due to environmental restrictions. The efficiency of manual crushing was low, which seriously affected the construction period.
Customer Feedback
“The stability of YG equipment in complex mining areas exceeded expectations. The comprehensive cost was 35% lower than that of imported brands. The after-sales service team responded to problems within 2 days. It is our first choice for long-term cooperation.” – Project Leader Hadi Wijaya
Process of Indonesian customers purchasing an integrated rock drill and splitter
- Demand communication (1-3 days)
- Customers submit operation scenarios (rock type, average daily workload, etc.);
- YG engineers recommend compatible models and provide 3D configuration solutions.
- Arrange customers to visit our machine production factory;
- Contract signing (1-2 days)
- Confirm price, payment method (support LC/TT), and delivery time (15 days for spot, 30 days for customization);