Crawler water well drilling rig safety operation specification

The crawler water well drilling rig is based on a small core drilling rig with added hydraulic support and a crawler walking device. Crawler walking is more convenient. Equipped with hydraulic support, it can work more stably. There are three main models of tracked core drilling machines: XYD130/180/200. Based on our years of experience and understanding of water well drilling rigs, we have summarized the following drilling rig operating specifications. If you need this machine, click to learn about the equipment, and we will provide you with a competitive price!

Free Quote Now

Advantages of crawler water well drilling rig

  1. The crawler water well drilling rig adopts an automatic telescopic drilling tower, supported by two high-strength oil cylinders. Therefore, the machine is time-saving, labor-saving, safe, and reliable to operate.
  2. The chassis of the water well drilling rig adopts rubber tracks, which reduces the weight of the machine. At the same time, it can also reduce walking noise and minimize vehicle vibration.
  3. The chassis comes with four high-strength threaded support legs for quick and convenient installation and adjustment, which can be used for leveling the working plane and can serve as auxiliary support during operation.
  4. The use of a 48V electric starting diesel engine greatly reduces the labor intensity of the operator.
  5. This machine is equipped with an independent mud pump, which has a high flow rate and pressure.
  6. This series of devices has three optional models XYD-200/XYD-180/XYD-130.

Free Quote Now

Crawler Mounted Well Drilling Rigs Operating Specifications

  1. Before operating the crawler water well drilling rig, the operator should carefully read the “Water Well Drilling Machine User Manual”. Proficient in the performance structure, technical operation, maintenance, and upkeep of drilling rigs.
  2. Operators of crawler type water well drilling rigs must receive professional training before operating the equipment.
  3. During operation, the user’s personal clothing should fit well and be tightly tied to avoid entanglement with the moving components of the drilling machine.
  4. The overflow valve and functional valve group in the hydraulic transmission system have been debugged to the appropriate position cover before leaving the factory, and it is strictly prohibited to adjust them arbitrarily.
  5. Before starting the drilling operation, it is necessary to pay attention to the working environment around the drilling machine to avoid sinking and collapse.
  6. Before starting the water well drilling rig, ensure that all components of the rig are intact and undamaged.
  7. When the machine is working, it should operate within the specified speed, and overloading is strictly prohibited.
  8. During the drilling process of the water well drilling rig, when the drill rods are connected by threads, it is strictly prohibited to reverse the power head to avoid wire detachment. It can only be reversed after adding or removing drill rods and firmly clamping the drill rods with clamps.
  9. During the drilling process of the water well drilling rig, when adding drill rods, it is necessary to ensure that the threads at the connection of the drill rods are tightened.
  10. During the drilling process of the water well drilling rig, it is strictly prohibited to stand in front of the drilling rig, and the operator should stand on the side.
  11. When the crawler-type water well drilling rig is in operation, the operator should be particularly careful and pay attention to safety when approaching the exposed leakage parts of the drilling rig.
  12. When replacing hydraulic components, be sure to ensure that the hydraulic oil passage is clean and free of debris. And it needs to be done without pressure.
  13. The four directional wheels of the lifting chain must be kept clean, and the chain should be lubricated with fuel instead of grease.
  14. When there is a hydraulic oil leak, stop working and maintain it before starting work.
  15. When the crawler water well drilling rig is stopped and not in use, the power should be cut off as soon as possible.

YG crawler water well drilling rigs

The above are the main points to pay attention to when operating a crawler water well drilling rig. YG is a professional drilling rig manufacturer. We are committed to providing you with a variety of high-quality drilling rig equipment. In addition to crawler water well drilling rigs, we also produce, small hydraulic core drilling machines, trailer-mounted water well drilling machines, and tractor-mounted water well drilling machines.

    Please feel free to give your inquiry in the form below. We will reply in 24 hours.
    Product Model:
    Your Name(required):
    Your Email(required):
    Your Phone(required):
    Your country:
    Your Whatsapp(required):
    Your Message(required):

    Leave a Comment

    Your email address will not be published. Required fields are marked *

    Scroll to Top